View of an under construction Top Pool Bridge with Hine Road Recreation Area in view. The bridge connects the reserve, to Top Pool a favourite swimming area in Wainuiomata River.
Photographer: Jeremy Foster
View of an under construction Top Pool Bridge with Hine Road Recreation Area in view. The bridge connects the reserve, to Top Pool a favourite swimming area in Wainuiomata River.
Photographer: Jeremy Foster
Councillor Dixon requests us to state that he signed the memorandum in reference to Mr Clark’s telegram, yesterday, by...
It is generally considered that the loan of £130,000 is wholly inadequate for the completion of the Wainuiomata works...
The Wainui water has not yet reached the city owing to a burst in the pipes, about a mile...
The Wainuiomata Wastewater Treatment Plant was decommissioned in November 2001 after serving the community since the 1950s.
The following tenders have been received by the Corporation:- Laying 30-inch water-mains in the Wainui Valley.
1869 Jan – John Stack – commenced employment at Haslam’s Sawmill. Evening Post: 19 Jan 1870.
Looking at Gums Loop Meadow located on Gums Loop Walk in the Wainuiomata Regional Park. The meadow was once...
The Gawler Reservoir has a capacity of 3.9 million litres, while the larger Konini Reservoir holds 5.1 million litres.
Wainuiomata .Net is a dedicated platform that highlights the history and natural beauty of Wainuiomata.
Contact Form for Wainuiomata.Net
(On our company’s website.)
© 2025 virtualtopia.com